E3 Ecology was contacted in 2020 to undertake an ecological impact assessment of a proposed development site in Ingleby Barwick, Stockton-on-Tees. The ecological work was required to inform a planning application for a residential development of the site.

An initial walkover survey was completed to assess the habitats on site in accordance with JNCC Phase 1 Habitat Survey methodology and to conduct a preliminary assessment of ecological constraints and opportunities that may require further survey or assessment, mitigation or compensation measures.

The initial survey highlighted the requirement for further detailed botanical assessment during the summer, which was completed to fully characterise the grassland on site. In addition, further survey was recommended to assess habitat suitability and potential presence of water vole, otter, bats and badger. These surveys were subsequently instructed.

Bat transect and remote monitoring surveys were completed to assess bat activity on the site, finding the site to be used by common pipistrelle and noctule bats, with a low number of Myotis sp. bats also recorded. A ground-level assessment of trees on site for potential to support roosting bats identified a single tree with moderate suitability to support roosts – potentially requiring further dusk and dawn presence / absence surveys from May to September. Consequently, a climbed aerial inspection with ropes and harnesses was completed of the tree by E3’s licensed and CS38 qualified bat surveyors. The features in question were found to be of lower suitability upon closer inspection, due to exposure to adverse weather and rainwater. As a result, no further bat presence / absence surveys were subsequently required and the tree could be felled using best practice methods.

Otter and water vole surveys of an adjacent watercourse found no evidence of either species and similarly a site walkover survey looking for field signs of badger recorded no evidence of use by the species, though they may visit the site on occasion if present in the local area due to the suitability of habitats.

Mitigation, compensation and enhancement measures were recommended within the EcIA report and E3 remain on call to assist with any further ecological requirements or consultation.

 

An ECoW Project – Union Chain Bridge

An ECoW Project – Union Chain Bridge What is an ECoW? An ECoW (Ecological Clerk of Works) monitors works on a development site, and provides advice on how to manage ecological and environmental risks. They ensure that works are completed…

Use of Infra-red during bat surveys

During the summer of 2022, E3 Ecology was commissioned to undertake bat surveys of an agricultural barn on the outskirts of Newcastle. Based on an initial daytime bat risk assessment survey, the building was considered to be of only low suitability…

Bat surveys and licensed work at a school in Prudhoe

Bat surveys and licensed work at a school in Prudhoe, Northumberland E3 Ecology was contacted in October 2020 by a facilities management company regarding a re-roofing project at a school in Prudhoe, Northumberland. The school roof was being…

British Ornithologists’ Union Records Committee

Staff member Ross Ahmed was admitted to the British Ornithologists' Union Records Committee (BOURC) in July 2023. The committee maintains the official list of birds recorded in Britain and has done since 1883. The committee consists of around…

Bats In Winter

I can strongly recommend Pat Waring’s Bats in Winter Course as a good opportunity to think about what bats are doing between November and March, 5 months of the year, and why so little weight is given to surveys for them, or assessing winter…

Biodiversity Net Gain (BNG)

Biodiversity Net Gain (BNG) is an approach that leaves the environment in a better state than previously following development. BNG is to be a mandatory element of the planning system, but its principals are already being applied by developers. One…